AEM Gestione Srl ordered to W.T.E. the replacement of the system to feed furnace with medical waste, installed on the Line n.1 of the incineration plant in Cremona.
The new system included an innovative solution to insure cooling with water collected from the existing boiler.
Capacity: 2 lines of 17,8 MWth : 198 t/d x 1910 kCal/kg