Object: Thermal cycle

Engineering and permitting services

WTE has been in charge to develop technical documents in order to get the authorisation from Public Authority to use of a diathermic oil / steam boilers systems. The aim was to assure the compliance of the characteristics of existing components with parameters defined by law. SATTA & BOTTELLI, sited in the neirbourough of Milan, …

Engineering and permitting services Read More »

low-temperature econimiser

Consulting

ECOSESTO Spa requested W.T.E. to give technical consulting concerning the calculation of feed in tariff after the start-up of the solar plant installed as an auxiliary sytem  of the thermal cycle on the biomass plant in Rende (Calabria).  

Flue gas cleaning system dimensioning

Offer engineering

Carlo Gavazzi Impianti requested  W.T.E.  to deliver  engineering services in order to complete the documents for tender concerning the thermal cycle (27 MWe) and the flue gas cleaning system of a new biomass to energy plant. W.T.E.  calculated energy and mass balances both in-  and off-design and delivered Process Flow Diagrams.    

project thermal cycle 1MWe

Preliminary study: thermal cycle in a distillery

Preliminary study of a new thermal cycle and steam turbine capacity 1MWe. The distillery, D.E.T.A. located in Barberino Val d’Elsa, wanted to use its grapes residues and lees for energetic purposes.

Incineration plant tail end boiler

Engineering of new cooling towers

W.T.E. designed a new lay out of wte cooling towers, also delivering structural design of related reinforced concrete platform. Client: A.Am.P.S. Spa Livorno

mascioni site

CHPP 50MWth from coal to biomass with 15MWe new thermal cycle. Feasibility study

Mascioni S.p.A. (Cuvio-VA), an important Italian yarn-dyeing factory, appointed W.T.E. to design and engineer the way to substitute coal for PKS (Palm Kernel Shell) and dried sewage sludge in its 50 MWth boiler. The boiler had to deliver superheated steam (455 °C e 64 bar) to a co-generative thermal cycle, including a new full condensing …

CHPP 50MWth from coal to biomass with 15MWe new thermal cycle. Feasibility study Read More »