Measurement of wall thickness, EfW plant
Measurement of wall thickness, Modena MSW incineration plant, line 1, 2 and 3
Measurement of wall thickness, Modena MSW incineration plant, line 1, 2 and 3
W.T.E. provided the on-line cleaning of line 1 of the boiler installed on the incineration plant managed by AGSM VERONA , by the Bang & Clean system.
From 2002 to 2005 W.T.E. provided to M.E.T.A. Spa many interventions of ordinary maintenance of the furnace-boiler system . These maintenance operations were realised on the three lines of the waste to energy plant sited in Modena. Maintenance services included: cleaning on line by Bang & Clean system of boilers and degasers; Measurement of wall …
On-line cleaning of line 1 boiler installed on the MSW incineration plant in Ravenna, managed by Ecologia Ambiente SpA.
consulting on Electrical Energy Production in a MSW plant
Feasibility study for the replacement of the furnace installed on the incineration plant owned by Se.Ver.a..
W.T.E. carried out the design of a new parallel flow water steam superheaters (SH) for the existing boilers (2 x 17.5 tons/hour of steam) on the incineration plant owned by GEOFOR SPA. This solution was required in order to reduce the recorded heavy corrosions on the tubes due to clorine acid action.
FExamination on corrosion damages of a boiler installed on the MSW incineration plant in Colleferro. The boilers were provided by Lurgi-Pianimpianti. The plant was managed by G.A.I.A. SPA, multiutility.
W.T.E. provided the on-line cleaning of line 2 of the boiler installed on the incineration plant managed by CORE Spa, by the Bang & Clean system.
W.T.E. studied a new cooling system at the interface between lower and upper grates for the waste to energy plant owned by META Spa. During the ordinary running of the furnaces the Client observed the recurrently build up of molten slag on the steps and wanted to solve that inconvenient in order to allow the …