W.T.E. provided the on-line cleaning of line 1 of the boiler installed on the incineration plant managed by AGSM VERONA , by the Bang & Clean system.

construction supervision

Maintenance services

From 2002 to 2005 W.T.E.  provided to M.E.T.A. Spa many interventions  of ordinary maintenance of the furnace-boiler system . These maintenance operations were realised on the three lines of the waste to energy plant sited in Modena. Maintenance services included: cleaning on line by Bang & Clean system of boilers and degasers; Measurement of wall …

Maintenance services Read More »

construction supervision

Maintenance services

On-line cleaning of line 1 boiler installed on the MSW incineration plant in Ravenna, managed by Ecologia Ambiente SpA.

MSW-Geofor

Design of a superheater for incineration plant-Geofor Spa

W.T.E. carried out the design of a new parallel flow water steam superheaters (SH) for the existing boilers (2 x 17.5 tons/hour of steam) on the incineration plant owned by GEOFOR SPA. This solution was required in order to reduce the recorded heavy corrosions on the tubes due to clorine acid action.

incineration plant CORE

Maintenance services

W.T.E. provided the on-line cleaning of line 2 of the boiler installed on the incineration plant managed by CORE Spa, by the Bang & Clean system.  

combustion grate WTE Waste To Energy

Consulting about malfunctioning

W.T.E. studied a new cooling system at the interface between lower and upper  grates for the waste to energy plant owned by META Spa. During the ordinary running of the furnaces the Client observed the recurrently build up of molten slag on the steps  and wanted to solve that inconvenient in order to allow the …