Spare parts supply
W.T.E. delivered several spare parts (thermocouple) to Dister Energia Spa. Frequent customers as Dister turn to W.T.E. for urgent specific supplies.
W.T.E. delivered several spare parts (thermocouple) to Dister Energia Spa. Frequent customers as Dister turn to W.T.E. for urgent specific supplies.
Pre-feasibility study of the convertion of the combustion system installed on the incineration plant from owned by Veolia Servizi Ambientali Tecnitalia Spa in Gioia Tauro (RC). The existing fluid bed furnaces were fed with RDF and they would be transformed into moving grate furnaces fed with MSW. The capacity of the plant was 49 MWth. …
Prefeasibility of the conversion of 2 EfW furnaces from fluidized bed to moving grate Read More »
Ecosesto SpA, coordinated by Actelios Spa, ordered to W.T.E. the design and the supply of a superheated steam boiler and auxiliary equipment for a power plant, located in Rende (Italy), fed by wood chips and olive residues. The plant was undergoing a complete revamping system in order: 1) to increase efficiency of energy recovery and …
Modifications of existing lines, with installation of booster fans W.T.E. was ordered to deliver a feasibility study of the upgrade of booster fans allowing the discharge of combustion fumes, one fan for each line of the incineration plant with fluidised bed technology in Macomer. In the project the new fans are placed before the existing …
Feasibility study of installation of booster fans, wte plant in Macomer Read More »
Design and installation of a new dust recirculation system
W.T.E. signed a contract with ATZWANGER AG for the design of two boilers (20 tons/hour steam, T=370 øC, p=36 bar), to be installed at the AAMPS Livorno incineration plant. The contract included the expediting activity, the design of the combustion control system and the training of operators and management of the plant. The boilers were …
Design of two HRSG on a waste to energy plant and control system Read More »
Coordination of Distributed Control System (DCS) engineering
Geofor Spa -Pisa Incineration plant 2 lines x 15 MWt Design of two isolating dampers for loading waste chutes.
MASCIONI SPA periodically requested W.T.E to provide on-line cleaning intervention in order to realise maintenance operations without shutting down the plant.
Analisys of Fluised bed malfunctioning Studio di fattibilità per la sostituzione del forno a letto fluido esistente sulla Line 2- Termovalorizzatore di Macomer, della società TOSSILO Spa, con un forno a griglia di tipo non-adiabatico integrato con il generatore di vapore. Il progetto di revamping fornito da W.T.E. ha suggerito le modifiche utili all’ottenimento di …
Consulting on malfunctioning of fluized bed on wte plant Read More »