Object: Furnace

Tecnocasic MSW incineration plant

Engineering for revamping of furnaces on MSW incineration plant

TECNOCASIC had to realise the revamping of MSW incineration plant located in Cagliari neirbourough in order to comply with environmental Italian law. Main sections of plants were replaced after new design of all the system. W.T.E. was required to deliver the basic engineering, thermodimanic calculation of new process, and detailed engineering  for the reconstruction of …

Engineering for revamping of furnaces on MSW incineration plant Read More »

refractory laying

Expediting and vendor compliance of refractory

GPC Gruppo Public Consult Spa committed to  W.T.E. the  expediting and the vendor compliance audit during the refractory laying  of furnace installed in third line of waste to energy plant located in Schio (Italy).

layout of area treatment hospital waste

Engineering: hospital waste combustion system

W.T.E. delivered basic engineering  to ALSTOM Power Italia  for the study of a system for the combustion of hospital waste in the furnaces of the incineration facility ” Silla 2″, owned by AMSA. The capacity of the plant was: 3 lines of 70 MWth each, turnines of 60 MWe and complete flue gas cleaning system.