Construction management of waste to energy plant’s revamping

GEA Spa, owner of a waste to energy plant in Ospedaletto (Pisa), decided the total refurbishment of the two furnaces, including feeding systems, also for hospital wastes and post combustion chambers. W.T.E. was appointed to deliver basic engineering and technical specifications concerning  furnaces and combustion grates, boilers, auxiliary systems; the arrangement of automatic control and …

Construction management of waste to energy plant’s revamping Read More »

consulting engineering

Engineering services

ALSTOM required to W.T.E. to develop: the coordination between all different control systems installed on the waste to energy plant (GEA-Pisa) the draft of commissioning and start-up procedures of the whole plant, with special analisys of procedures for furnaces; study of testing  procedure methodic.

Offer engineering

Daneco Impianti SpA ordered to W.T.E. the engineering for offer related to a project of a new waste to energy plant to be realised in Sassari (Sardinia). The capacity of the plant would be 270.000 tons/year of municipal solid waste to be incinerated by two lines of 35 MWth-17 MWe. W.T.E. delivered basic engineering, all …

Offer engineering Read More »