Feasibility study for biomass to energy plant
Transforest Srl, a company operating in the forestry exploitation, committed to W.T.E. the feasibility study of a biomass to energy with 50 MWth capacity fed with wood chips.
Transforest Srl, a company operating in the forestry exploitation, committed to W.T.E. the feasibility study of a biomass to energy with 50 MWth capacity fed with wood chips.
W.T.E. collaborate for an offer engineering related to a complete Biomass to Energy system.
Consulting – on a continuous basis – on few critical items in the management and performances of the MSW incineration plant, located in Vercelli and operated by Termomeccanica Group on behalf of the municipal company ATENA, the owner.
Consulting on untimely collapse of furnace roof occurred on the waste to energy plant managed by ACCAM sited in Busto Arsizio (Varese)
Review of design criteria of a slaughterhouse waste incineration system (expert opinion)
Daneco Impianti SpA ordered to W.T.E. the engineering for offer related to a project of a new waste to energy plant to be realised in Messina(Sicily). The plant would process 430.000 tons per year of municipal solid waste by three lines of 62.5MWth-53 MWe. W.T.E. delivered basic engineering, all technical specifications, metric calculations of main …
W.T.E. developed the structural engineering of the silos to be erected in a gravel pit. During the construction serious structural faults arised and W.T.E. was appointed to verify calculation and carry out the remediation project in order to reinforce the load-bearing structure. Final client Cava ARMATI- Sovere (BG)
Technical and economical viability of a MSW incineration plant (2 x 47 MWth lines, thermal cycle with 19 MWe T/G)
Development of a new Aluminum smelting process. Process design including mass and energy balances, P&I and general layout of the system, dimensioning of the major components of the system.
The ORTOLAN Srl company gave to W.T.E. the role of general consultant for the engineering to present a complete project for urban waste management to the public authorities in Ankara (Turkey) The project included: 300.000 tons/year MSW incineration plant (3 x 52 MWt lines, complete with T/G, dry and wet APC system, auxiliary landfill for …
General Consultant-Engineering of complete waste treatment system Read More »