feasibility_study 30 MW Biomass to Energy system
1 x 30 MWt Biomass to Energy system
1 x 30 MWt Biomass to Energy system
Troubleshootinging of conveyor belt on Ferrara Geotermia plant
Comer Engineering Srl committed to W.T.E. a feasibility study for a new MSW incineration plant with energy recovery, 25 MWth to be realised in Seychelles islands.
In order to comply with European and Italian law and regulations concerning renewable energy sources, Ecosesto Spa required to W.T.E. the issue of all technical documents to obtain the authorisation for the major revamping of its biomass power plant installed in Rende (Italy).
Biomass to Energy system, based on two 12 MWt lines supplying 5 MWe plus additional power to a district heating system.
1 MWe wood chips Biomass to Energy system. Chips from a short rotation forestry
2,5 MWe wood chips Biomass to Energy system
Transforest Srl ordered to W.T.E. the preliminary technical report about a proposal of a 24 MWt biomass furnace to be submitted to Public authorities in order to receive the permit to build the plant. The plant should be mainly fed by green wood, wood scraps, but it is also designed to burn miscanthus.
1 MWe wood chips/fowl manure Biomass to Energy system