Design and supply
W.T.E. provided the basic engineering, the detailed engineering and the supply of a steam superheater (17,5 t/h, 48 barg, 385°C) to be installed on the existing waste to energy plant in Cremona, final client AEM Gestioni Srl.
W.T.E. provided the basic engineering, the detailed engineering and the supply of a steam superheater (17,5 t/h, 48 barg, 385°C) to be installed on the existing waste to energy plant in Cremona, final client AEM Gestioni Srl.