Industry: Waste to energy plant

De-dust system layout

Feasibility study of air cleaning system

In the ambit of fly ashes handling system installed in AMSA – Milano incineration plant, WTE was appointed to carry out the feasibility study for an air cleaning system. The air was drawn from the unloading fly ashes area, located in the fly ashes inertisation plant.

waste to energy plant AEM Gestioni

Design and supply

AEM Gestione Srl ordered to W.T.E. the replacement of the system to feed furnace with medical waste, installed on the Line n.1 of the incineration plant in Cremona. The new system included an innovative solution to insure cooling with water collected from the existing boiler. Capacity: 2 lines of 17,8 MWth : 198 t/d x …

Design and supply Read More »

combustion grate WTE Waste To Energy

Consulting about malfunctioning

W.T.E. studied a new cooling system at the interface between lower and upper  grates for the waste to energy plant owned by META Spa. During the ordinary running of the furnaces the Client observed the recurrently build up of molten slag on the steps  and wanted to solve that inconvenient in order to allow the …

Consulting about malfunctioning Read More »

feeding system

Engineering services

W.T.E. supported TBF AG  in the engineering of the feasibility study for the feasibility study of new AMSA Milano 61.5 MWt incineration plant.    

bang & clean license

Maintenance services

W.T.E. provided to AEM Gestioni Srl many interventions  of ordinary maintenance of the furnace-boiler system of the incineration plant. Maintenance services included: cleaning on line by Bang & Clean system measurement of  thickness of steam boiler tube walls.  

consulting engineering

Feasibility study: integration of a 3 x 61 MWt MSW incineration plant with a combined turbogas cycle

Technical and economical viability of the integration of a 3 x 61 MWt MSW incineration plant with a turbogas cycle. The study of the impact on generation performances was developed by the analysis of 24 different operational functioning, related to weather conditions during the year. Main data of boiler and condenser  performances were described by …

Feasibility study: integration of a 3 x 61 MWt MSW incineration plant with a combined turbogas cycle Read More »

Offer engineering

Daneco Impianti SpA ordered to W.T.E. the engineering for offer related to a project of a new waste to energy plant to be realised in Messina(Sicily). The plant would process 430.000 tons per year of municipal solid waste by three lines of 62.5MWth-53 MWe. W.T.E. delivered basic engineering, all technical specifications, metric calculations of main …

Offer engineering Read More »