Preliminary design of APC system EfW plant
Preliminary design of a flue Flue Gas Cleaning System – Salerno MSW incineration project
Preliminary design of a flue Flue Gas Cleaning System – Salerno MSW incineration project
Comer Engineering Srl committed to W.T.E. a feasibility study for a new MSW incineration plant with energy recovery, 25 MWth to be realised in Seychelles islands.
Measurement of wall thickness, Modena MSW incineration plant, line 1, 2 and 3
The Gruppo Hera, owner of the incineration plant installed in Ravenna, requested W.T.E. to provide an on-line cleaning intervention in order to reduce the fouling into the furnace and boiler of the Line 3, without shutting down the plant.
AEM Gestioni Srl and W.T.E. signed an annual contract for on-line cleaning of boilers existing on the incineration plant in Cremona. This system allowed to carry out the cleaning activity during the running of the plant and to avoid the complete shut down. The boilers and furnaces were cleaned thanks to controlled explosions of bags …
GEOFOR Spa ordered to W.T.E. to provide a maintenance intervention on the two furnaces of the incineration plant by means the on-line cleaning system, Bang & clean.
GRUPPO Hera and W.T.E. subscribe a two-year contract for use the on-line cleaning system for the maintenance of the furnace-boiler section of the incineration plant in Ravenna.