A.Am.P.S., owner of the incineration plant in Livorno, ordered to W.T.E to develop the technical feasibility study of theremoval of the existing steam condenser and of the erection of the new one with improved performances.
TOSSILO Spa, owner of the MSW incineration plant in Macomer, appointed W.T.E. to draft the technical and economical prefeasibility study giving: – the lay out and the dimensioning of a new incineration plant with 30 MWth capacity, to be built in the area of the existing one, operating with two fluidised bed furnaces; – grate …
Feasibility Study of new waste to energy plant, 30 MWth Read More »
Asstistance and supervision concerning energy efficiency of thermal cycle
Development of detailed engineering related to revamping of Cremona MSW incineration line 1 and supply of the new concept variable pressure auxiliary boiler.
W.T.E. signed a contract with ATZWANGER AG for the design of two boilers (20 tons/hour steam, T=370 øC, p=36 bar), to be installed at the AAMPS Livorno incineration plant. The contract included the expediting activity, the design of the combustion control system and the training of operators and management of the plant. The boilers were …
Design of two HRSG on a waste to energy plant and control system Read More »
Supporting MAIRE on the engineering of the offer for TRM, Gerbido (Torino) MSW incineration plant
Basic and Detailed Engineering of receiving and grinding system of bulky waste, Padova incineration plant
Geofor Spa -Pisa Incineration plant 2 lines x 15 MWt Design of two isolating dampers for loading waste chutes.