Engineering of new cooling towers
W.T.E. designed a new lay out of wte cooling towers, also delivering structural design of related reinforced concrete platform. Client: A.Am.P.S. Spa Livorno
W.T.E. designed a new lay out of wte cooling towers, also delivering structural design of related reinforced concrete platform. Client: A.Am.P.S. Spa Livorno
W.T.E. was appointed to carry out expediting, quality control and engineering review for the new fired boiler, 60 MWth of capacity, to be installed on the MSW incineration plant in Bolzano. The boiler was mainly manufactured in India.
GEOFOR Spa, owner of the incineration plant in Pisa appointed W.T.E. to study the optimization of the combustion delivering a whole control system to reduce the emission of pollutants. The plant had 2 lines, 15 MWt each, fed by MSW/RDF. The implemented logic enhances the level of quality and quantity of combustion by means of …
W.T.E. studied and delivered to Hascon Engineering the dimensioning of a spray dryer and technical specifications of washing towers to be provided to foreign client.
ALSTOM POWER Italia required the provision of QA/QC engineering services. The quality plan referred to a Project of an upgrading of desulphurisation system on an existing waste to energy plant (Brescia). The main scope of work included reducing emissions of sulphur oxides (SOx) at the stack and optimising the consumption of chemicals in the meantime. …
W.T.E. delivered to TOSSILO Spa project of a new combustion control system in order to allow the maximum reduction of pollutant emission, especially CO and TOC emissions, of the incineration plant in Macomer operating with two fluidised bed furnaces. The analysis and tests made by W.T.E. specialists pointed out some critical aspects of the process …
Combustion control system of CO emission from FBC Read More »
Modifications of existing lines, with installation of booster fans W.T.E. was ordered to deliver a feasibility study of the upgrade of booster fans allowing the discharge of combustion fumes, one fan for each line of the incineration plant with fluidised bed technology in Macomer. In the project the new fans are placed before the existing …
Feasibility study of installation of booster fans, wte plant in Macomer Read More »
W.T.E. provided to the Client, TOSSILO Spa, the project of a new grinding & feeding system to be installed on the existing incineration plant, in Macomer (Sardinia). The new feeding system was required suitable for non sorted waste brought to the plant with large dimension. The project developed opted for a significant modification of the …
Engineering of a new grinding-feeding system for incineration plant Read More »
Pre-feasibility study of the convertion of the combustion system installed on the incineration plant from owned by Veolia Servizi Ambientali Tecnitalia Spa in Gioia Tauro (RC). The existing fluid bed furnaces were fed with RDF and they would be transformed into moving grate furnaces fed with MSW. The capacity of the plant was 49 MWth. …
Prefeasibility of the conversion of 2 EfW furnaces from fluidized bed to moving grate Read More »
VEOLIA entrusted W.T.E. with troubleshooting the excessive CO levels in the exhaust gas, measured at the unique stack, used by three lines. The plant was owned by Vercelli Energia and managed by VEOLIA. W.T.E. designed and delivered a combustion control system, to be implemented on an existing DCS, and supplied all necessary new instruments. The …
Design & supply of new combustion control system on 3 lines MSW plant Read More »