Industry: Waste to energy plant

Incineration plant tail end boiler

Engineering of new cooling towers

W.T.E. designed a new lay out of wte cooling towers, also delivering structural design of related reinforced concrete platform. Client: A.Am.P.S. Spa Livorno

Flue gas cleaning system dimensioning

Basic engineering

W.T.E. studied and delivered to Hascon Engineering the dimensioning of a spray dryer and technical specifications of washing towers to be provided to foreign client.

waste to energy A2A Brescia depurazione fumi

Engineering services for QA/QC

ALSTOM POWER Italia required the provision of QA/QC engineering services. The quality plan referred to a Project of an upgrading of desulphurisation system on an existing waste to energy plant (Brescia). The main scope of work included reducing emissions of sulphur oxides (SOx) at the stack and optimising the consumption of chemicals in the meantime. …

Engineering services for QA/QC Read More »

Feasibility study of installation of booster fans, wte plant in Macomer

Modifications of existing lines, with installation of booster fans W.T.E. was ordered to deliver a feasibility study of the upgrade of booster fans allowing the discharge of combustion fumes, one fan for each line of the incineration plant with fluidised bed technology in Macomer. In the project  the new fans are placed before the existing …

Feasibility study of installation of booster fans, wte plant in Macomer Read More »

Prefeasibility of the conversion of 2 EfW furnaces from fluidized bed to moving grate

Pre-feasibility study of the convertion of the combustion system installed on the incineration plant from owned by Veolia Servizi Ambientali Tecnitalia Spa in Gioia Tauro (RC). The existing fluid bed furnaces were fed with RDF and they would be transformed into moving grate furnaces fed with MSW. The capacity of the plant was 49 MWth. …

Prefeasibility of the conversion of 2 EfW furnaces from fluidized bed to moving grate Read More »

combustion control system

Design & supply of new combustion control system on 3 lines MSW plant

VEOLIA entrusted W.T.E. with troubleshooting the excessive CO levels in the exhaust gas, measured at the unique stack, used by three lines. The plant was owned by Vercelli Energia and managed by VEOLIA. W.T.E. designed and delivered a combustion control system, to be implemented on an existing DCS, and supplied all necessary new instruments. The …

Design & supply of new combustion control system on 3 lines MSW plant Read More »