Pre-feasibility study
Comparison between the traditional HP steam Rankine cycle and ORC (Organic Rankin Cycle), with particular reference to small Biomass to Energy plants (1 MWe).
Comparison between the traditional HP steam Rankine cycle and ORC (Organic Rankin Cycle), with particular reference to small Biomass to Energy plants (1 MWe).
W.T.E. was appointed to design and engineer a biomass plant, 18.7 MWe of capacity, in order to obtain public permission to build the plant and to deliver electric and thermal energy. This project was part of the initiative finalized to convert into an energy plant the Eridania-Sadam sugar mill, installed in Castiglion Fiorentino. The project …
Preliminary feasibility study for revamping of an obsolete Biomass to Energy plant
W.T.E. organised a training course which would prepare the operators to the conduction of the plant. The course was focused on three items: furnace: combustion and control of pollutant emission; maintenance combustion diagram combustion control and steam production.
Basic Engineering including technical specifications for a new Biomass Plant with an installed power of 50 MWt, fed by wood chips and olive oil residues. Location : Reggio Calabria
Actelios Spa, company owned by Falck Renewables Spa, commissioned to W.T.E. Waste To Energy the design of a biomass cogeneration plant with 17 MWe-60 MWth capacity. Scope of the work was to obtain permitting named AIA and VIA from public authorities in Torremaggiore (FG) The high efficiency power plant would be fed by lignocellulosic biomass …
Design and supply of a Biomass to Energy system (installed power 1 MWe). Scope of supply including: boiler, condenser, degaser, auxiliary systems.
Design, manufacturing, supply start up and commissioning of a 24 MWt furnace fed by wasted biomass (wood chips, wine production waste, straw, kernel and stones), including auxiliaries and Process & Combustion Control. Maximum Quantity of biomasses to be burnt: 10 tonnes hour of grape’s harvest and winery by-products at 1850 kcal/kg. LHV shall be in …
Biomass/RDF energy system composed by 2 x 30 MWt furnaces. Design of air treatment system according to best available technology (BAT) Il progetto proposto ha previsto due linee da 17 MWt ciascuna, per la termovalorizzazione di biomasse costituite da legno non trattato, proveniente dalle operazioni di pulizia dei boschi, tale da permettere l’erogazione a pieno …
Feasibility Study Biomass/RDF Plant 2×30 MW, Castelnuovo Garfagnana Read More »