Engineering for gas booster fans and related control logics
Engineering development of booster fans and related control logics in two lines, fluidized bed, of municipal solid waste Incineration plant of Macomer (NU), plant managed by TOSSILO Spa.
Engineering development of booster fans and related control logics in two lines, fluidized bed, of municipal solid waste Incineration plant of Macomer (NU), plant managed by TOSSILO Spa.
W.T.E. designed a new lay out of wte cooling towers, also delivering structural design of related reinforced concrete platform. Client: A.Am.P.S. Spa Livorno
A feasibility study was carried out to evaluate, both form economic and technical point of view, the possibility to dry organic and industrial slurry to feed the 51.7 MWth coal boiler as an alternative to coal. Mascioni Spa, co-generative power station, Cuvio (VA) Some plant figures: -Maximum Continuous Rate (MCR): 51.7 MW -Maximum gross power …
Study of a sludge drying system to substitute coal in an utility boiler. Read More »
W.T.E. studied and delivered to Hascon Engineering the dimensioning of a spray dryer and technical specifications of washing towers to be provided to foreign client.
Design, engineering, start-up and testing of a new control system, to be applied on an anaerobic digestion plant, on following biogas handling and on related burners, already installed in a biomass furnace.
Development of a software for the predictive monitoring of boiler fouling to: adjust in real-time of the soot blowing cycles predict concretions and build-up schedule plant downtime for cleaning operation W.T.E. provided software to process boiler bundles thermodynamic data in order to advice operators about fouling.
Actelios Spa, company owned by Falck Renewables Spa, commissioned to W.T.E. Waste To Energy the design of a biomass cogeneration plant with 17 MWe-60 MWth capacity. Scope of the work was to obtain permitting named AIA and VIA from public authorities in Torremaggiore (FG) The high efficiency power plant would be fed by lignocellulosic biomass …
Detailed engineering, new slag transportation system
TOSSILO Spa, owner of the MSW incineration plant in Macomer, appointed W.T.E. to draft the technical and economical prefeasibility study giving: – the lay out and the dimensioning of a new incineration plant with 30 MWth capacity, to be built in the area of the existing one, operating with two fluidised bed furnaces; – grate …
Feasibility Study of new waste to energy plant, 30 MWth Read More »
Modifications of existing lines, with installation of booster fans W.T.E. was ordered to deliver a feasibility study of the upgrade of booster fans allowing the discharge of combustion fumes, one fan for each line of the incineration plant with fluidised bed technology in Macomer. In the project the new fans are placed before the existing …
Feasibility study of installation of booster fans, wte plant in Macomer Read More »