Engineering services for two Turbogas plants
W.T.E. provided engineering services to E.s.e. Srl in order to support this client in evaluating Air Condensers to be installed on two Combined Cycle Power Plant in Middle East countries.
W.T.E. provided engineering services to E.s.e. Srl in order to support this client in evaluating Air Condensers to be installed on two Combined Cycle Power Plant in Middle East countries.
W.T.E. provided Carlo Gavazzi Impianti with process engineering to draft offers for new biomass plants in Macchiareddu, Russi, Casei Gerola , final client Enel Green Power . W.T.E. delivered engineering services for approx. 1000 h.
W.T.E. delivered to ALSTOM engineering services related to the new DeSOx system to be installed downstream a 320 MWe utility boiler on the coal power plant in Litoral Almeria (ES).
Preliminary study of a new thermal cycle and steam turbine capacity 1MWe. The distillery, D.E.T.A. located in Barberino Val d’Elsa, wanted to use its grapes residues and lees for energetic purposes.
W.T.E. delivered engineering services to support ALSTOM Power in offer engineering of a wet flue gas desulphurization system to be installed on the existing power plant in Craiova.
Dister Energia commissioned to W.T.E. a feasibility study for a co-generative, biomass plant, with 50 MWth capacity, applying the BAT (Best Available Technology).
Carlo Gavazzi Impianti required an evaluation of its proposal of a new Biomass to Energy plant 50 MWth redacted in order to participate in an ENEL GREEN POWER tender.
Evaluation of combustion process and control system of MSW incineration plant owned by ACEGAS-APS Spa in Trieste. The scope of work was to identify potential causes of abnormal consumption of natural gas connected to CO over production in one of three furnaces. W.T.E. studied the trend of the combustion and elaborated several energetic balances identifying …
Process and control system of waste to energy plant Read More »
ABET Laminati SpA had high energy consumption in the processes: through a third party (CRESM)they appointed W.T.E. to study the optimization of the existing combustion process and a new co-generative thermal cycle. The processed fuels are industrial by-products, very reach in ashes, which frequently plug furnace and boiler. W.T.E. delivered a feasibility study that concerned …
Feasibility study for energy recovery from industrial refuse Read More »
Basic and Detailed Engineering to adapt the steam turbine and the thermal cycle of Padua MSW incineration plant to the district heating. ACEGAS APS, owner, appointed W.T.E. to study and design the delivery of heat from the existing thermal cycle to the future district heating. The evaluation had to be done considering all existing furnaces …