Design and installation of a new dust recirculation system
Design and installation of a new dust recirculation system
Design and installation of a new dust recirculation system
VEOLIA entrusted W.T.E. with troubleshooting the excessive CO levels in the exhaust gas, measured at the unique stack, used by three lines. The plant was owned by Vercelli Energia and managed by VEOLIA. W.T.E. designed and delivered a combustion control system, to be implemented on an existing DCS, and supplied all necessary new instruments. The …
Design & supply of new combustion control system on 3 lines MSW plant Read More »
ALSTOM Power Italia ordered to W.T.E. the engineering, the construction and delivering of a second gypsum slurry diverter for a desulphuration system installed on the Power plant “Centrale Thermique de Provence”, fed by coal, located in Meyreuil, France
Development of detailed engineering related to revamping of Cremona MSW incineration line 1 and supply of the new concept variable pressure auxiliary boiler.
FUEL TECH Engineering ordered to W.T.E. the complete project, the construction and transport of two urea-NH3 reactors to be installed on a MSW incineration plant, Brest (France)
W.T.E. designed, supplyed and managed the erection of a 30 m stack, installed on an industrial plant, owned by Europlastic, located in an urban area, close to a major airport.
AEM Gestione Srl ordered to W.T.E. the replacement of the system to feed furnace with medical waste, installed on the Line n.1 of the incineration plant in Cremona. The new system included an innovative solution to insure cooling with water collected from the existing boiler. Capacity: 2 lines of 17,8 MWth : 198 t/d x …
W.T.E. designed, engineered and delivered the system for collection and separation of rain water system to be installed on the waste to energy plant SILLA II, owned by AMSA SpA in Milano. The new design considered a passive system for separation of first rain water to be collected in a dedicated tank. The new system …
W.T.E. provided the basic engineering, the detailed engineering and the supply of a steam superheater (17,5 t/h, 48 barg, 385°C) to be installed on the existing waste to energy plant in Cremona, final client AEM Gestioni Srl.